Skip to content
PolecatRemodeling · Greensboro, NC

Answering 24/7 · Greensboro and the Triad

Call 24/7(336) 347-1995

Templated on level boxes

Countertop installation in Greensboro

Laminate past its prime? We install quartz, granite, butcher block and laminate tops in Greensboro, cabinets leveled and sink reconnected. Call to start.

  • Answering 24/7
  • Greensboro and the Triad
  • Sink and faucet reconnected

Answering 24/7 for Greensboro and the Triad

Quartz countertop with an undermount sink in a remodeled Greensboro, NC kitchen

Short answer

Greensboro countertop installation averages about $3,680 as a line item in Fixr's local remodel guide, which lists quartz at $50 to $75 a square foot and granite at $70 to $140. We level the cabinets, coordinate the template and handle the plumbing disconnect and reconnect, so the sink is back in use.

A countertop is only as flat as the cabinets under it. Before the fabricator comes to template, we check every base for level and fix whatever is off, since stone will not bend to follow a sagging box. We also confirm the sink, faucet and cooktop models, because the cutouts are cut from their spec sheets.

On install day the old tops come off, the new ones are set and seamed, and the sink is mounted. Plumbing is reconnected once the adhesive has set. We seal natural stone that needs it and show you what to clean it with, and what to keep off it entirely.

What moves the price of countertop installation

Material sets most of the price, and the shape of your kitchen sets the rest.

  • Material and slab Quartz, granite and quartzite each have a range; premium patterns sit above it.
  • Square footage and seams More runs and corners mean more seams and shop time.
  • Cutouts and edges Undermount sinks, cooktops and thicker edges add fabrication.
  • Removal and prep Old tops come out and boxes get leveled first.
What the figure coversPublished rangeSource
Countertop installation, Greensboro line item$3,680 average (installation); quartz $50-$75 per sq ft; granite $70-$140 per sq ft; quartzite $60-$100 per sq ftFixr - Greensboro NC kitchen remodel cost guide (Dan Simms)

Published figures are averages from the sources named, not a quote. Your price comes after the walk-through.

Quartz, granite, butcher block or laminate

MaterialUpkeepWatch for
QuartzNo sealingHot pans, direct sun
GranitePeriodic sealingSlab variation
Butcher blockRegular oilingWater at the sink
LaminateWipe cleanHeat, swollen seams

Quartz countertops for a busy kitchen

Quartz is engineered from crushed stone and resin, so it needs no sealing and shrugs off stains from coffee and wine. The tradeoffs: it can scorch under a hot pan set straight on it, and it can discolor in strong direct sun over time. Seams show on most patterns, so we plan them away from the sink and cooktop. Fixr's Greensboro guide lists quartz material at $50 to $75 per square foot, and HomeGuide's national installed range is $1,500 to $8,000 for an average kitchen.

Granite countertops and picking your slab

Granite is quarried, so every slab is different, and the slab you see at the yard is the one you get. We suggest choosing it in person and marking where the seams will fall. Most granite needs a penetrating sealer from time to time; we seal at install and show you a simple water test for when to do it again. Fixr's Greensboro guide lists granite at $70 to $140 per square foot, and HomeGuide puts 30 to 40 square feet at $2,400 to $6,000 nationally.

Butcher block and laminate on a tighter budget

Laminate has come a long way from the old speckled tops, and a square-edge laminate costs a fraction of stone and goes in quickly. It does not tolerate heat, or standing water at the seams. Butcher block brings warmth, suits an island and needs oiling plus attention around the sink. We often pair them: stone on the perimeter, wood on the island. Both are cut and installed on site, which skips the fabrication wait stone requires, and neither puts stone's weight on the cabinets.

Undermount sink cutouts and where the seams go

An undermount sink hangs below the stone, so the cutout edge has to be polished and the sink properly supported. We use clips or a support bracket sized for the sink's loaded weight, then seal the joint. Seams are placed with the fabricator: never over a dishwasher, and ideally not through the sink cutout. A good seam is tight, color-blended and flat. A bad one has a ridge you can feel with a fingertip, and we do not accept it.

Call (336) 347-1995Want someone to look at your room? The phone is answered around the clock.

Granite countertop seam being leveled beside a polished undermount sink cutout

Remodeling this in Greensboro houses

Two local details shape this job. Greensboro's water is soft: the City's October 2024 report lists finished-water hardness of 51 mg/L at the Townsend plant and 34 mg/L at Mitchell, so mineral film around the faucet matters less here than in hard-water towns, and the choice of top comes down to heat, stains and looks. And with about 15.6 percent of the city's homes built in the 1980s, per ACS figures cited by Point2Homes, many tops we see are original laminate on cabinets worth keeping.

How long you will be without counters

For stone, the gap between template and install depends on the fabricator's shop schedule, and the old tops usually stay in use until install day. Removal, setting and sink mounting happen in one visit for most kitchens. Laminate and butcher block cut on site can go faster, since there is no shop step.

How we run the job, step by step

  1. Level the cabinetsEach base is checked and corrected before templating.
  2. Confirm fixturesSink, faucet and cooktop specs go to the fabricator.
  3. TemplateThe fabricator templates against the fastened cabinets.
  4. Tear out and setOld tops out; new ones set, seamed and leveled.
  5. Mount, seal, reconnectSink mounted, stone sealed where needed, plumbing reconnected.

For kitchens we install and work with KraftMaid, Wellborn and Merillat, among others.

KraftMaidWellbornMerillatSilestoneCambriaDaltileKohlerMoenBlumKraftMaidWellbornMerillatSilestoneCambriaDaltileKohlerMoenBlum

Questions

Questions about countertop installation

Ready when you are

Pick the top, and we handle everything around it

From level boxes to a working faucet. Call us any hour to set up a measure.

Call any hour(336) 347-1995Greensboro · High Point · Winston-Salem

Reach the office

Talk to us about the room you want to change

Phone
(336) 347-1995
Hours
Answering 24 hours, 7 days a week
Office
1441 Deerrun Dr, Randleman, NC 27317
Coverage
Greensboro and the Piedmont Triad

Greensboro and the Piedmont Triad on the map

Call (336) 347-1995 24/7